Skip to main content
Loading…
This section is included in your selections.

(1) Permitted Uses.

(a) Parks.

(b) Public facilities.

(c) Public uses.

(d) Recreation facilities, such as:

(i) Golf course.

(ii) Trails (walking, horse, bicycle).

(iii) Game fields (e.g., soccer, baseball).

(e) Schools.

(f) Communication tower (subject to MDC 18.30.130).

(2) Conditional Uses. None.

(3) Lot Size Requirements. None.

(4) Setback Requirements. None, unless:

(a) All setbacks (front, side, rear, corner) for structures must be a minimum of 12 feet when abutting a residential zone.

(5) Height Requirements. No structure(s) may exceed 35 feet when measured from the ground to the peak of the roof.

(6) Parking Regulations. Parking areas must meet the requirements of MDC Table 18.25.050-1 in MDC 18.25.050 and the requirements of MDC 18.25.040 through 18.25.070.

(7) Sanitation Regulations. Before any structure receives a certificate of occupancy, it must be connected to the City sewer system where the structure(s) is within 300 feet of an existing City sewer.

(8) Water Regulations. Before any structure receives a certificate of occupancy, it must be connected to the City water system unless authorized by the City for connection to an adjoining water system.

(9) Lighting. All lighting must comply with the outdoor lighting standards. [Ord. 933 § 3.11, 2019.]